PCU LED
8.5. Placing the components
With the nitrogen version, the supplied
post-curing insert is placed in the expo-
sure chamber and the components are
36
36
Time setting
Setting the date and time for
the time stamp of the process
recording which is shown, inter
alia, in the "final screen" in
the user level.
Factory setting
When reverting back to the
factory settings, the individual
parameter settings are deleted
and the device is reset to the
delivery state.
positioned on the glass plate of the post-
curing insert.
9. Maintenance
Maintenance work to be performed by the user
Maintenance unit
Clean the glass panes in the bottom and the lid of the
polymerization chamber with isopropyl alcohol
Before commissioning check whether all connections of the
device are positioned correctly:
• gas connection
• mains connection
Cleaning of the device with a mild detergent
Maintenance work to be performed by the service commissioner
Maintenance unit
Check whether the LED panels must be or changed
Check whether the LED panels must be calibrated
Check whether the gas valve works reasonably
Check the lid closing function
Check whether all seals are still functional and/or fit correctly * monthly
* Recommendation, actual need depends on use intensity and other requirements.
Maintenance frequency
* daily
* daily
* weekly
Maintenance frequency
* weekly with program
LED-Test
* monthly
* weekly
* weekly
37
37