Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wash the ice scoop holder along with the other interior
components using the following instructions.
Replace the ice scoop holder by replacing the screws or
on some models, pushing in on the holder and then down.
A. Ice scoop holder
11. Wash the interior components (cutter grid, exterior of hoses,
and water pan) and the storage bin, door gasket, ice scoop,
and ice scoop holder with mild soap or detergent and warm
water. Rinse in clean water. Then clean the same parts with a
solution of 1 tbs (15 mL) of household bleach in 1 gal. (3.8 L)
warm water. Rinse again thoroughly in clean water.
NOTE: Do not remove hoses. Do not wash plastic parts in
dishwasher. They cannot withstand temperatures above
145°F (63°C).
12. To replace the water pan, set the water pan inside the ice bin.
Hook up the water pan pump. Snap the pump bracket back
onto the water pan and place back into position. Secure the
water pan by replacing the mounting screw.
affresh
is a registered trademark of Whirlpool, U.S.A.
*
®
18
13. Check the following:
14. Slide the cutter grid back into place and secure it by replacing
A
the right-hand screw and plastic spacer. Then tighten the left-
hand screw. Reconnect the cutter grid harness and the ice
level sensor harness.
15. Replace the cutter grid cover.
NOTE: On some models, replace the cutter grid cover using
the screw removed earlier.
16. Gently wipe the control panel with a soft, clean dishcloth
using warm water and a mild liquid dish detergent.
17. Plug in ice maker or reconnect power.
18. After cleaning, make sure that all controls are set properly and
that no control indicators are flashing.

Quick Clean

You will need to use one 16-ounce (473 mL) bottle of approved
ice maker cleaner. We recommend using the *affresh
Machine Cleaner part number 4396808.
Drain cap from the water pan is securely in place. If the
drain cap is loose, water will empty from the water pan,
and you will have either thin ice or no ice.
Hose from water pan is inserted into storage bin drain
opening.
Ice
®

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kuix335hwh

Table des Matières