BEFORE THE INSTALLATION
This models can be used only if connected
with external motors produced by the same
manufacturer.
PANELS OPENING
It is possible to open the steel panels, which
cover the grease filters, by slightly pulling on
a side of the panel itself, as shown in Fig. 1.
To achieve the complete opening of panels,
you need to release the safety chains, by
using the appropriate spring catches.
For proper working, it is recommended to in-
stall the appliance at a distance of 83" from
the floor.
Before starting the appliance installation, ple-
ase check that all components are not dama-
ged, in such a case contact your retailer and
do not carry out installation.
INSTALLATION
Fit a false ceiling with an opening that has the
following dimensions:
SUT950: 57"
x 37"
43/64
distance of 12" between the ceiling and the
false ceiling;
SUT951: 41"
x 26"
59/64
I N S TA L L ATIO N
63/64
12/64
SUT958: 34"
4/64
distance of 12" between the ceiling and the
false ceiling.
After having chosen the most suitable posi-
tion, prepare the ducting: an air outlet con-
nection piece, with a diameter of 6" to be in-
stalled in the side selected, is provided with
the appliance.
Leave any unused exhaust outlets closed.
As shown in fig. 2.
Draw the outline of the hole to house the
ceiling-mounted hood on the solid ceiling as
shown in Fig. 3 according to the model cho-
sen.
Make 4 holes in the ceiling according to the
dimensions as shown in Fig. 4, place the
metric plugs provided in the holes.
6
x 15"
60/64