BPEO Size 0
Optical Fiber Splice Enclosure
Content
1. Product description
3. Application
6. Operating the mid span double cable entry
7. Installation of mid span cable
8. Installation of optical fiber splice trays
9. Optical fiber routing
10. Installation of single port cable entries ECAM S7 and S9,5
13. Flash pressure test
1. Product description
Splicing capacity of the enclosure is based on number and type of splice trays. Trays come with 2 versions 1 or 2 pitches
thickness; they are interchangeable and can be mixed. This allows multiple configuration using fusion splice and / or
mechanical splices (type Fibrlok
2. Recommended installation tools
Please use the appropriate tools recommended by the cable manufacturer to prepare the cables.
Flat end screwdriver (recommended width: 8mm).
Pressure tool kit (to perform a pressure flash test at 200 mbar).
Leak detection kit.
3. Application
The enclosure is designed for:
Protect and manage bare fibers or micro structure modules in the optical fiber trays.
Can be installed underground in manhole or overground on pole or facades.
The package is composed of:
- 1 Splice closure, closed with sealed cable entries and the optical fiber
organizer.
- 1 red colored plastic tool to help maintaining and managing loose tubes
or micro sheaths of the cable.
- 1 installation instruction.
Please read and follow these instructions carefully before starting to
install this closure.
If the present product has delivered with optional devices, please check
prior to install if they have to be included throughout the mounting
process.
Without the need to comply to particular, local installation practices,
please proceed to the product installation while respecting the specific
rules of deploying optical fibers.
TM
ref 2540G) and / or PLC type of splitters (see §11).
Installation instructions page 1
Instructions de montage page 11
page 1
page 1
page 1
page 2
page 2
page 3
page 3-4
page 4
page 5-6
page 6-7
page 7-8-9
page 9-10
page 10
1

Publicité

Chapitres

Table des Matières
loading

Sommaire des Matières pour 3M BPEO Taille 0

  • Page 1: Table Des Matières

    4 9. Optical fiber routing page 5-6 10. Installation of single port cable entries ECAM S7 and S9,5 page 6-7 11. Fusion or Mechanical 3M Fibrlok splices page 7-8-9 12. Closing the enclosure page 9-10 13. Flash pressure test page 10 1.
  • Page 2: Recommended Installation Tools

    4. Fixing the splice enclosure Recommended distance between the axes: 135mm Mounting bracket is part of the splice enclosure base. Wall mount According to local situation either use the external opened holes or one external and the centered one (recommended). Fasten the enclosure using 2 screws.
  • Page 3 2,20m (fig. 15). 1,10m (fig. 14). This length is applicable to any double entry from the 3M BPEO range of products. 1,10 m 2,20 m 7. Installation / Coiling the slack tubes or micro modules Please insert the double cable entry with the latch oriented to the top as it will support the storage (coiling up) of the slack tubes.
  • Page 4 Place the uncut fibers and maintain the bundle using a piece of hook and loop fastener: (not included) 3M Scotchflex TIE-WRAP code 89839. Secure uncut fiber bundle in the required area. Retention parts Scotchflex 8. Installation of fiber trays Important notice: There are 2 types of splicing trays. 5mm thick tray can be installed on each position of the holding part.
  • Page 5 9. Fiber routing 9.1. Use of enclosed routing accessories Fibers are maintained along their route by red colored plastic holders witch are installed on their pins by using the red colored plastic stick (Pic 18-19). When not used the red plastic stick can be parked acc. to Pic 19. The set of holders and tool are clipped on the clear plastic cover of the last installed splicing tray (Pic 20).
  • Page 6 9.3. Fiber routes inside the splicing tray Fan out the fibers in the tray entering from the right port or from the left port of the splicing tray (Pic 23-24). Splicing Tray RIGHT Port LEFT Port To route fiber from one tray to another, there are two possible routes depending on the necessity to use the entry port on the same side or on the opposite side.
  • Page 7: Fusion Or Mechanical 3M Fibrlok Tm Splices

    Note: Loose tubes or micro modules from upper ECAM ports should be routed right on the surface of the routing plate. Those form the lower ECAM ports should be routed on top of them. 11. Fusion or Mechanical 3M Fibrlok splices 11.1.
  • Page 8 11.1.2. Mechanical splices FIBRLOK ref 2540G Install the mechanical splices as per company practices. Please refer to the relevant instruction. In order to accommodate up to 6 mechanical splices in the tray, you must remove the pre cut part of the tray cover of the 5mm thick splice tray (As shown on drawing 30).
  • Page 9: Closing The Enclosure

    11.2.2. Fusion SPLICES Install the fusion splices as per company practices. Please refer to the relevant instruction. 12 fiber tray: Install the heat shrink fusion splice protectors in 2 levels of 6 splices (Pic 41) 24 fiber tray: Install the heat shrink fusion splice protectors in 3 levels of 8 splices (Pic 42) 11.2.3.
  • Page 10: Tightness Test

    Check, that the guiding pins are properly inside of their corresponding slots on the front and the rear of the closure. Push the dome of the closure down in order to "click" the latches completely. 2 - Correct insertion of the large guiding parts.
  • Page 11: Description Du Produit

    Instruction de montage page BPEO Taille 0 Boitier de protection d’épissures pour fibres optiques La boite d’emballage comprend : - 1 boitier de protection d’épissure fermé avec bouchons sur les entrées de câbles et organiseur fibre optique. - 1 outillage plastique (rouge) de maintien des tubes ou micro structures.
  • Page 12: Fixation Du Boitier

    Être installé en chambre ou sur poteau avec feuillard standard (non représenté). Entraxe préconisé : 135mm 4. Fixation du boitier Le support de montage est intégré au corps du boitier. Montage mural Suivant la configuration du terrain, utiliser les encoches extérieures ou une encoche centrale avec une encoche extérieure (préconisé).
  • Page 13: Utilisation Des Entrées

    Entrée simple: Dénuder 1,10 m de câble (dessin 14). Entrée double: Dénuder 2,20 m de câble (dessin 15). Cette longueur concerne toutes les entrées doubles de la gamme BPEO 3M. 1,10 m 2,20 m 7. Installation / lovage du câble en passage Nous préconisons d’insérer l’entrée double avec les pattes d’amarrage sur le dessus afin de faciliter le lovage du toron à...
  • Page 14: Montage Des Cassettes

    Lover les fibres en passage et maintenir le toron en utilisant du ruban auto grippant type: 3M Scotchflex TIE-WRAP code 89839. Placer le lovage ainsi obtenu dans son logement. Points de retenue des torons Scotchflex 8. Montage des cassettes Important : Il existe des cassettes d’épaisseur 5 mm (1 pas) qui peuvent être installées sur chaque position de la platine et des cassettes d’épaisseur 10 mm (2 pas) qui doivent être installées en laissant toujours une position libre à...
  • Page 15: Cheminement Des Fibres

    9. Cheminement des fibres 9.1. Description outillage Les fibres sont maintenues par des plaquettes de rétention détachables poussées avec l’outil (photo 18-19). L’outil se range sur la patte de rangement (photo 19). La plaque se range «clippée» sur le couvercle transparent de la troisième cassette installée (photo 20), si quatre cassettes, ne pas placer la plaque sur la dernière cassette.
  • Page 16: Circulation Des Fibres Dans Les Cassettes

    9.3. Circulation des fibres dans les cassettes Distribuer les fibres dans la cassette par la droite ou par la gauche de l’organiseur (photos 23-24). Fibres lovées Platine Entrée GAUCHE Entrée DROITE Pour passer d’une cassette à une autre, deux cheminements sont possibles suivant que l’on souhaite ou non entrer du même coté: Même côté...
  • Page 17: Cassette 1 Pas (Épaisseur 5 Mm) 2 Modèles

    Retrait des bouchons des sorties simples S7 et S9,5 Démonter les bouchons en suivant la recommandation ci-dessus (photo 25). Pincer le bouchon côté intérieur du boitier et le tirer depuis l’extérieur. Le conduit doit être parfaitement propre avant la mise en place de l’entrée de câble. Détail de l’opération de démontage des bouchons.
  • Page 18: Cassette 2 Pas (Épaisseur 10 Mm)

    11.1.2. Épissures FIBRLOK réf 2540G dans cassette 1 pas Réaliser les épissures (non représenté). Afin d’accueillir les épissures type FIBRLOK dans les cassettes 1 PAS, la zone pré découpée du couvercle transparent de la cassette doit être retirée (dessin 30). Photo 31: Épissure MAL positionnée.
  • Page 19: Épissures Fusion

    11.2.2. Épissures FUSION Réaliser les épissures (non représenté). Bloquer les manchons de protection d’épissures dans les supports de la cassette (photos 41). Cassette 12 FO : Les 12 épissures sont empilées en 2 rangées de 6 épissures. Cassette 24 FO : Les 24 épissures sont empilées décalées en 3 rangées de 8 épissures. (Photo 42). 11.2.3.
  • Page 20: Test D'étanchéité

    Veiller à ce que les doigts de guidage du couvercle à l’avant et à l’arrière soient bien engagés dans le corps. Appuyer avec les doigts alternativement sur les pattes à gauche et à droite du couvercle, prévu à cet effet, jusqu’à ce que les pattes d’accroches soient bien clippées sur le corps.
  • Page 21 Important Information The details contained in this literature have been carefully prepared from information available to 3M at the time of its production. However, it is not intended to be relied upon for purposes of product specification and you should contact your sales representative if specification details are required.

Table des Matières