Installation Of The Shelves - Porkka SP17783 Instructions D'emploi Et Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 102

INSTALLATION OF THE SHELVES

1
3
8
9b
9a
5
7
2
6
4a
4b
Ladder rails (1) are installed at the factory (excl. rails behind the unit in 1200 wide rooms).
Fasten the wall bracket extension piece (9a) with attached connecting part (9b) and M5 bolts (Note! Rooms 2400/2440 mm high
only).
Fasten the end pieces (2) to the end of the support bars (3). If the shelf length is more than 2 meters, you must extend the pipes
with a connector (8).
Place the shelf supports (4a) at the correct height in the wall supports (1).
Install the extension holder (4b) in its place (Note! Rooms 1200 mm deep only).
Llift the pipes over the shelf supports so that the protrusion of the end pieces of the pipes faces upwards (2).
Please note the height of the shelves can be adjusted independently by 50 mm on each wall.
Place the shelf plates (5) over the pipes so that the rounding on the edge of the plate faces the room.
Note! Install the shelf plates according to the layout drawing.
Centre the shelves by moving the pipes sideways. Then remove the last shelf plate of each row (6) and set the bar fasteners (7) as
shown in the picture. Put the shelves back.
Note! The maximum shelf load is 100 Kg of evenly distributed product per meter, per level i.e. 400 Kg per meter run.
8

Publicité

Table des Matières
loading

Table des Matières