Commissioning - Burkert 6115 Instructions De Service

Masquer les pouces Voir aussi pour 6115:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PTB 01 ATEX 2194 X
Installation and commissioning
Activity
Screwing on the pipe run
Installation / Dismounting
Make electrical
connections
Types of connection
Rectangular plug
2 individual wires
connector
Notes
Note the direction of flow!
Note
Always connect the earth
conductor!
Note for units with connecting
cable
The connecting cable and the
coil are moduled together. They
must not be dismantled!
-
Circular plug
connector

7.3. Commissioning

Before commissioning, ensure that
• The device has been correctly installed,
• The connections have been correctly made,
• The device is not damaged,
• All bolts are securely tightened.
english
11

Publicité

Table des Matières
loading

Table des Matières