START
35 KIS
- Move the bottom of the case forward and then upwards to detach
it from the frame.
- Unscrew the panel screws (B).
- Turn the control panel forwards.
START 24 KIS
START 28 KI
28 KIS
START 35 KIS
- Unscrew the tapping point screw upstream of the gas valve by
approximately two turns and connect a pressure gauge.
On the control panel:
- set the function selector to
temperature selector to the maximum
- turn the boiler on by setting the main switch to "ON"
- open the hot water cock to the maximum flow rate
- with the burner lit at the maximum output, check that the gas
pressure is between the minimum and the nominal supply values
as specified in the multigas table
- turn off the hot water tap
- disconnect the pressure gauge and tighten the pressure tapping
point upstream of the gas valve.
Pressure tapping
point upstream
of valve
A
B
B
B
Summer mode and the DHW
Combustion check
START KI
- Install the "Flue analysis collection" kit in the straight pipe section
after the hood output, at least 400-500 mm from the hood (as
envisaged by current standards). To install, follow the instructions
supplied with the kit.
- Turn the main system switch to "OFF".
- Set the function selector to
temperature selector to the maximum.
- Turn the boiler on by setting the main switch to "ON".
- Open the hot water tap to the maximum flow rate.
- With the boiler at the maximum output, you can check combustion.
START KIS
- Open the hot water tap to the maximum flow rate
- Set the function selector to
temperature selector to the maximum
- Turn the boiler on by setting the main switch to "ON"
- With the boiler at the maximum output, you can check combustion
- On completion of the check, shut off the hot water tap.
- Remove the tester sensor and close the test point.
- Close the panel and refit the case, following the disassembly
procedure described above in reverse order.
START
28 KI
START
24 KIS
START
28 KIS
ENGLISH
"Summer mode" and the DHW
"Summer mode" and the DHW
Hole for flue analysis
tester
9