Arneg Santiago 2 Manuel D'installation Et De Service page 45

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 84
Santi ago 2
English
Installati on is reserved to technicians trained and authorised by the body specifi ed in the
contract (manufacturer/dealer/distributor)
i
- It is the responsibility of the customer to prepare the installati on area
- Changes to the setup described here must be authorised by ARNEG S.p.A.
The cabinet can be delivered packed as follows:
• with frame in wood fi xed to the base and nylon casing blocked by straps (standard) (Fig.6)
• with a cardboard casing (on request) (Fig.7)
• with wooden crate (on request) (Fig.8)
• comply with the local standards in force
The installati on
• comply with the environmental climati c class chap. 8
area should
• have a fl oor able to support the weight of the cabinet
• be equipped with a switch with automati c protecti on against short circuits,
• provide the space required for correct venti lati on, use and maintenance
For the cabinet to work properly, the room temperature and relati ve humidity
Conditi ons
must not exceed the limits of a climate class 3 (+25°C; R.H. 60%) according to
environmental
standard EN ISO 23953.
Cabinet delivery • ensure the packing is intact and that it does not display readily apparent dam-
• carefully perform the unpacking operati on in order not to damage the cabinet
• check that cabinet components are intact
• if you encounter damage, immediately call the manufacturer
Installati on pro-
cedure (Fig.5)
42
earth discharge and leakage circuit between the electric power line and the
cabinet
age
ATTENTION! Accidental opening of the doors. Injury.
Keep the doors closed and locked during installati on.
ATTENTION! Accidental opening of the doors. Tilti ng of the unit. Injury.
Step
carefully examine the installati on area, eliminati ng any danger to the op-
1
erator
2
remove the package only if the cabinet is placed in the operati on area
3
lift the cabinet safely
4
use suitable scissors to cut the clip ti ghtening straps-A-
5
remove the clips and the frame
6
lower and place the cabinet in the area of use
7
adjust the horizontal positi on of the cabinet using a spirit level (Fig.9)
8
check that all feet are resti ng on the fl oor
9
level the cabinet both in front and back
fi t the cabinet with an inclinati on towards the wall of at least 10mm
10
(Fig.11)
Install maximum 3 cabinets within the same power supply and cooling
line
Should you need to move the cabinet, the latt er must be levelled again.
Incorrect levelling compromises operati on of the cabinet
i
To mount/unmount the back panels rotate the fastener B (Fig.23)
Acti on
05060185 00 19-06-2019

Publicité

Table des Matières
loading

Table des Matières