Periodic Maintenance Of The Therapy Unit; Safe Transport And Storage Of The Therakair Visio Mrs; Transport And Storage Of Individual System Parts; Transport Of System While Fitted To Hospital Bed - arjo TheraKair Visio Manuel D'utilisation

Masquer les pouces Voir aussi pour TheraKair Visio:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 123

Periodic Maintenance of the Therapy Unit

Periodic maintenance to be performed at regular intervals while the unit is in operation and after
each patient includes the following:
1. Operate the unit's functions and observe the operation of the unit as outlined in the
Operation chapter of this manual. If any abnormalities are observed in the operation of the
unit contact Arjo.
2. Inspect the mattress, cover sheet, therapy unit and air supply hose for wear and damage.
Unserviceable items should be replaced with an identical item.
3.
that opens to the front of the case:
Power down the system.
Unlatch the drawer by lifting the button under the 'handle' part of the drawer.
Slide the drawer fully out.
4.
dry naturally

Safe Transport and Storage of the TheraKair Visio MRS

Transport and Storage of Individual System Parts

It is recommended that the system should be transported and stored in the packaging provided. It
is also recommended that the TheraKair Visio MRS be stored in the bag provided.

Transport of System While Fitted to Hospital Bed

When transporting the system while attached to a hospital bed, ensure that the air supply hose and
the power cord are safely away from the wheels of the bed.
Take care that the therapy unit does not get damaged while pushing the bed through
hospital doors.
Slide the drawer fully out.
36

Publicité

Table des Matières
loading

Table des Matières