Electrical Wiring Work; Precautions On Electrical Wiring Work; Connecting Power Supply And Interunit Wiring - Hoval BelariaS11AE02 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
WARNING
Make sure to re-open both stop valves before restarting
operation of the unit.
14. E
LECTRICAL WIRING WORK
WARNING
All wiring must be performed by an authorized
electrician.
All components procured on the site and all electric
construction
shall
legislation.
DANGER: HIGH VOLTAGE
To avoid electrical shock, make sure to disconnect the
power supply 1 minute or more before servicing the
electrical parts. Even after 1 minute, always measure the
voltage at the terminals of main circuit capacitors or
electrical parts and, before touching, make sure that those
voltages are 50 V DC or less.
NOTICE
To persons in charge of electrical wiring work:
Do not operate the unit until the refrigerant piping is
complete. (Running it before the piping is ready will break
the compressor.)

14.1. Precautions on electrical wiring work

DANGER
Before obtaining access to terminal devices, all
supply circuits must be interrupted.
Be sure to install an earth leakage circuit breaker in
accordance with applicable legislation. Failure to do
so may cause electrical shock.
Use only copper wires.
A main switch or other means for disconnection, having a
contact separation in all poles, must be incorporated in the fixed
wiring in accordance with applicable legislation.
Do not turn on the main switch until all the wiring is completed.
Never squeeze bundled cables into a unit.
Fix cables so that cables do not make contact with the pipes
(especially on high pressure side).
Secure the electrical wiring with cable ties as shown in the figure
in chapter "14.2. Connecting power supply and interunit wiring"
on page 16 so that it does not come in contact with the piping,
particularly on the high-pressure side.
Make sure no external pressure is applied to the terminal
connectors.
When installing the earth leakage circuit breaker make sure that
it is compatible with the inverter (resistant to high frequency
electrical noise) to avoid unnecessary opening of the earth
leakage circuit breaker.
As this unit is equipped with an inverter, installing a phase
advancing capacitor not only will deteriorate power factor
improvement effect, but also may cause capacitor abnormal
heating accident due to high-frequency waves. Therefore, never
install a phase advancing capacitor.
CAUTION
Be sure to install the required fuses or circuit breakers.
BelariaS11~16AE02
Outdoor unit for air to water heat pump
4PW57796-1 – 10.2010
comply
with
the
applicable
4 209 843 / 00

14.2. Connecting power supply and interunit wiring

Secure the earth wire to the stop valve attachment plate so that
it does not slide.
Secure the earth wire to the stop valve attachment plate one
more time along with the electric wiring and the inter-unit wiring.
Lay the electrical wiring so that the front cover does not rise up
when doing wiring work and attach the front cover securely.
3
4
5
6
1
Switch box
2
Stop valve attachment plate
3
Earth
4
Cable tie
5
Wiring between units
6
Power supply and earth wiring
2
1
1
Power supply, earth wiring, and if applicable: bottom plate heater
wire
2
Wiring between unit
1
2
3
2
1
2
1
Installation manual
16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Belarias14ae02Belarias16ae02

Table des Matières