Assemblage Liste De Contrôle Paquet - toorx ERX95 Manuel D'utilisation

Table des Matières

Publicité

Assemblage Liste de contrôle paquet
ÉTAPE
1.
#104-1 Ø 8.7 × 20 × 1.5T
Flat Washer
(2pcs)
#80-1 5/16" × 15m/m
Button Head Socket Bolt
ÉTAPE
2
#84. M5 × 10m/m
Phillips Head Screw
(4pcs)
#112. 3/8" × 23 × 1.5T
(2pcs)
#105. 5/16" × 23 × 1.5T
Flat Washer
(4pcs)
Curved Washer
(2pcs)
Phillips Head Screw
#77. 3/8" × 3"
Carriage Bolt (2pcs)
#111. 5/16" × 1.5T
Split Washer
(6pcs)
2
#96. 3/8"
Cap Nut
(2pcs)
#82. M5 × 15m/m
(4pcs)
#80. 5/16" × 15m/m
Button Head Socket Bolt
(6pcs)
#113. 5/16" × 23 × 1.5T
Curved Washer
(2pcs)

Publicité

Table des Matières
loading

Table des Matières