Commissioning and operating
VVX
6
Commissioning and operating
Before switching on the VVX for the first time, please follow the instructions in the following
section.
6.1 Commissioning
Please check before initial start up whether
the VVX has been installed correctly and that all screw connections are sealed.
the electrical wiring has been connected properly.
the measuring system is vented by flushing.
Switch on the supply voltage.
6.2 Measuring operation
The following sections apply only to devices equipped with the corresponding functions.
6.2.1 Flow measurement
VVX with pulse output:
Depending upon the product version, the VVX
generates an NPN, PNP or push-pull square
wave signal proportional to the flow.
The pulse rate corresponds to the flow ( fig-
ure).
VVX with analogue output:
The voltage signal U
is present at the ana-
Flow
logue output of the VVX.
It is proportional to the measured flow.
6.2.2 Temperature measurement
The temperature is measured by an additional
sensor R
integrated into the measuring
Temp
tube.
This is either an NTC thermistor or a Pt1000
sensor.
If the VVX has an analogue output, U
may
Temp
optionally be accessed in place of the flow sig-
nal.