Step 3: Configure The Sounder's Jumpers - Abus Secvest FUSG50101 Instructions D'installation Et D'utilisation

Masquer les pouces Voir aussi pour Secvest FUSG50101:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56
Installation

Step 3: Configure the sounder's jumpers

• Remove the jumper/connector cover (see Fig. 1) by pushing the two fixing tabs (see Fig. 1)
outwards and lifting up the cover at the same time.
• Set all the jumpers in the sounder to the desired positions (see Fig. 3).
41 |
EN

Publicité

Table des Matières
loading

Table des Matières