6 - Undo the screws (M) to remove the lid (N).
7 - Use lever (P) to set the overload cutout to 1 A.
8 - Fit the lid (N) and secure it with the screws (M).
9 - Replace the control panel (D) on completion of
the operation.
10 - Remove the test voltage indicator sticker
from the dataplate and apply the new one
to identify the voltage being used.
Important
On completion of the operation make
sure that there are no malfunctions.
IT
GB

TESTING OF THE APPLIANCE

DE
FR
Important
Before it is put into service, the system
must be tested to check the operating con-
ES
ditions of every single component and
identify any malfunctions. In this stage, it is
important to check that all health and safety
requirements have been complied with in
full.
To test the system, make the following checks.
1 - Check that the mains voltage is the same as
that of the appliance.
English
2 - Operate the appliance's circuit-breaker to
check the electrical connection.
3 - Check that the safety device is operating cor-
rectly.
After testing, if necessary instruct the user in all the
skills necessary for putting the appliance into oper-
ation in conditions of safety, in accordance with le-
gal requirements.