Cristec JBNUM II-CPS3 Manuel D'utilisation page 40

Le moniteur de batterie
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wiring diagram for monitoring energy source:
SOURCE
OR
Only one
energy source
must be
connected to
U+ on the
In case the energy source supplies or recharge the batteries, for long period of non
operation (no battery charging), please disconnect the Battery Monitor in order to not
unload or destroy the battery by removing the fuse of the shunt.
The wiring is similar when 1, 2 or 3 sources are connected (see complete wiring attached)
Battery Monitor JBNUM II - CPS3
UTILIZATIONS
U+
B+
40
All utilizations
must be
connected to
B+ on the
shunt.
The shunt must be
installed on the
positive! Install the
shunt on the negative
would damage the
Battery Monitor.

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour Cristec JBNUM II-CPS3

Table des Matières