Cristec JBNUM II-CPS3 Manuel D'utilisation page 39

Le moniteur de batterie
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wiring diagram for monitoring battery:
SOURCES
AND
All energy
sources must
be connected to
U+ on the
shunt.
For long period of non operation (no battery charging), please disconnect the
Battery Monitor in order to not unload or destroy the battery.
-
Remove the fuse on the shunt.
Or
-
Install a battery switch between the pole B+ of the shunt and the pole + of the
battery.
The wiring is similar when 1, 2 or 3 batteries are connected (see complete wiring attached)
Battery Monitor JBNUM II - CPS3
UTILIZATIONS
U+
B+
39
All utilizations
must be
connected to
U+ on the
shunt.
The shunt must be
installed on the
positive! Install the
shunt on the negative
would damage the
Battery Monitor.

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour Cristec JBNUM II-CPS3

Table des Matières