Installation
4. Fix right stud (not
included) to middle
section (Distance
is 18-7/16" to the
outside of both
studs).
5. Fix right stud to
stud behind wall.
Screw every foot
to planned height
above middle sec-
tion.
6. Mark corners of
middle section on
fl oor.
4
18-7/16"
7. Remove middle
section from studs
and pull away
from wall. Screw
right stud to wall
where previously
covered.
8. Place bottom sec-
tion against wall,
standoff s between
studs and corners
inside the fl oor
marks. Check for
square (perpen-
dicular to wall).
9. Screw bottom
section to fl oor (4
screws).
Steel Framing Kit
90°
Produits Connexes pour Valor LX1 Serie