6.3
Commissioning the product
 Verify that the control unit and the probe(s) are properly mounted.
 Verify proper electrical connection.
 Verify that the required operating mode has been set.
 Verify that the control unit has been closed.
 Verify that the product has been properly wired.
1. Switch on the power supply via the on-site mains fuse.
- The connected PTC thermistors heat up.
- The connected PTC thermistors are heated up after approximately 8
seconds, provided they are not submerged in liquid.
2. Perform a function test (see chapter "Function test")
6.4
Function test
1. Submerge the probe(s) into liquid.
- The yellow LEDs must respond immediately.
2. Remove the probe(s) from the liquid.
- After approximately 8 to 15 seconds the yellow LEDs must change the
switching state.
3. Observe the green LED and the relay.
- The function sequence must correspond to the set operating mode, see
chapter "Operating mode".
7
Operation
The product automatically controls pumps and valves. The operation of the
product is limited to its regular monitoring:
Function test OK
Probes are free from deposits
Operation
RG 210
EN