Installation
.
Remove the three silver screws holding the three
wires to the terminal block terminals.
Remove
green ground screw holding power cord ground
wire to rear bulkhead.
Save all four screws.
Loosen the strain relief screw and pull the cord or
wires out through the rear of the dryer.
4. Attach one end of green ground wire (supplied
in
accessories
bag) to rear bulkhead
using green
ground screw removed
in step 3.
IMPORTANT:
Do not use power screwdriver
when
tightening
ground screw or terminal
block screws.
1
2
3
4
Silver L1 Terminal Screw
Silver Neutral Terminal Screw
Silver L2 Terminal Screw
Green Ground Screw
DRY2017N
1
1
Ground Screw
Figure 14
DRY2018N
Figure 13
18
© Copyright, Alliance Laundry Systems LLC - DO NOT COPY or TRANSMIT
512023