Télécharger Imprimer la page

Garland SHAKER 310 PG Manuel D'instructions page 32

Publicité

English
6. START UP INSTRUCTIONS
6.1.LIST OF MATERIALS
This machine includes the following elements that you
will find inside the box:
• Engine.
• Bottom transmission.
• Tools.
• Shaking device: 2 combs 3 pìcks
• 50 cm. extension tube
• 20 cm. extension tube
• Instruction manual.
Ensure that all elements listed above are included with
the machine. Thanks to the quality control checks at
the factory it is highly unlikely that any elements will
be missing. If you were to find any element missing,
do not use the machine until the defect has been
repaired or the machine is complete.
Using the machine with defective parts or without all
the elements can cause severe personal damages.
6.2. MOUNTING THE MACHINE
6.2.1. TRANSMISSION ASSEMBLY
Press the button (1) and insert the aluminum tube
assembly (2) into the aluminum tube connector (3).
Release the button (1) to ensure that the holes in the
aluminum tube assembly (2) are properly anchored,
rotate the aluminum tube and check that it does not
rotate.
Finally turn the knob (4) to lock the aluminum tube.
6.2.2. ASSEMBLY OF THE HARVESTING ACCESSORY
Install the carbon fiber rod (2) into the rocker arm (1)
and tighten it.
Insert pins (1) and (2) through gasket (3), rocker arm
(4), connecting rod (5) and gasket (3) into pin (6).
The length of pin (1) is longer than that of pin (2)
32/128

Publicité

loading