Gewiss JOINON Manuel D'installation Et Usage page 23

Masquer les pouces Voir aussi pour JOINON:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installing and connecting the unit
When the charging station has been charging for two seconds its LEDs light up. After briefly verifying its status,
the light will switch to green and the display will show an electric vehicle and the current time. The station is ready
and awaits identification from the user in order to begin charging.
If the station identifies any operating anomaly, the light turns red and the type of incident is shown on the display
(see section "9. Operation").
ABA2023IQM01_ - 7.55.4.494.0
ABA2023IQM01_ - 7.55.4.412.2 - Installation and Operation Manual
Gewiss
EN
ES
FR
IT
HU
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

R-evolution homeR-evolution parking

Table des Matières