KEOR SPE R/T
Installation and User Manual
3.4
Tower Mounting Procedure (2U/3U)
1) Carefully lift the UPS up.
2) Place the UPS inside the tower stands.
3) Shift the LCD display shown in the picture and rotate it 90° clockwise. Then push the display back.
The operation panel is installed well when a "click" sound is heard.
49