Télécharger Imprimer la page

Miele PDR 910 G Plan D'installation page 7

Masquer les pouces Voir aussi pour PDR 910 G:

Publicité

Tables
Required flow rate
Gas A (Natural)
Gas E (Propane HD-5)
Consumption calorific values
Gas A (Natural)
Gas E (Propane HD-5)
Settings with natural gas/liquid propane
In the case of natural gas, up to 0.04 psi (3 mbar) of pressure loss may occur when
checking the inlet pressure.
Gas pressure setting values
 Risk of electric shock from applied voltage.
The jet pressure is set during dryer operation with the side panel removed. Live electrical
components can be accessed while the side panel is removed.
Servicing, modification, testing, and maintenance of electrical machines must be carried
out in accordance with all appropriate legal requirements, accident prevention regulations,
and valid standards.
The jet pressure is checked/adjusted with the side panel removed from the gas-heated
tumble dryer.
- Install the front panel and the control panel on the gas-heated tumble dryer.
- Connect the gas-heated tumble dryer to the gas and electricity supplies for testing.
Gas type
Designation
Test gas
Natural
G20
gas H (E)
Natural
gas
Natural
G25
gas L (LL)
3B/P
G30
Liquid
propane
3P
G31
Supply air and exhaust air management
The tumble dryer may only be operated when the ducting has been connected properly
and the room is sufficiently ventilated.
Rated heat load Hi
8,9 kW
8,2 kW
Nominal
Restricted
Jet diame-
heater rat-
heater rat-
ter
ing
ing
kW
kW
mm
8.0
6.6
2.6
8.0
6.6
2.6
7.5
6.0
1.8
7.5
6.0
1.8
en - Installation notes
Flow rate
0,799 m³/h
0,317 m³/h
0,59 kg/h
40.1 MJ/m³
93.1 MJ/m³
50.05 MJ/kg
Densitiy ratio: 1.55
Air density: 1.2 kg/m³
Jet pres-
Jet pres-
sure
sure
±0.2 mbar
±0.2 mbar
Nominal
Restricted
heater rat-
heater rat-
ing HI
ing LO
mbar
mbar
8.3
4.9
12.0
7.1
9.0
6.0
12.0
8.0
Gas inlet pressure (mains pressure)
P
P
P
min
n
max
mbar
mbar
mbar
17
20
25
20
25
30
25
29
35
42.5
50
57.5
25
29
35
42.5
50
57.5
7

Publicité

loading