3 - Connect the circuit-breaker (A) to the terminal
boards (D) of the appliance as shown in the di-
agram and in the electrical system diagram at
the back of the manual.
Use a cable with at least H05RN-F characteris-
tics.
Important
When connecting, take care to connect the
earth line correctly
4 - Fix the cable with the screws (E).
5 - Replace the control panel (B) on completion of
the operation.
TESTING OF THE APPLIANCE
Important
Before it is put into service, the system must
be tested to check the operating condi-
tions of every single component and
identify any malfunctions. In this stage,
it is important to check that all health
and safety requirements have been
complied with in full.
To test the system, make the following checks.
IT
ADJUSTMENTS PROCEDURE
GB
The appliance's main functions do not require any
special adjustments by specialist staff except the
DE
FR
REPLACE PROCEDURE
ES
The appliance does not require the replacement of
operating components by specialist staff except the
DECOMMISSIONING THE APPLIANCE
Important
This operation must be carried out by skilled
operatives in compliance with the legal re-
quirements with regard to safety at work.
Never dump non-biodegradable materials,
lubricating oils and non-metallic compo-
English
ADJUSTMENTS
REPLACING PARTS
- 18 -
04WVT1-2IV-2WV
E
D
1 - Check that the mains voltage is the same as
that of the appliance.
2 - Operate the appliance's circuit-breaker to
check the electrical connection.
3 - Check that the safety device is operating cor-
rectly.
After testing, if necessary instruct the user in all the
skills necessary for putting the appliance into oper-
ation in conditions of safety, in accordance with le-
gal requirements.
settings made during use by the user.
replacement of standard parts which can be carried
out by the user.
nents (rubber, PVC, resins, etc.) in the envi-
ronment. Dispose of them in accordance
with the relevant legal requirements.
IDM-39613201000.tif
08WVT1-2IV
E
D
8
9