3.4.3.2 Histogram and Graph
For histograms and graphs, you can only select three objects, and select either IDU or refrigerant
system. The selected time for graphs and lists is based on the month (effective graph is based on day).
There are only two options in total energy: total energy, and operating energy.
In the graphs, histograms and tables, the optional parameters are "Total Energy" and "Operating Energy".
Operating Energy
IDU
Operating Electricity
Operating Electricity
ODU
Line Chart
Histogram
Total Energy
Operating electricity + standby power
Operating electricity + standby power + exceptional energy
41
V.1