10. Installation and commissioning
•
Check that the scope of delivery of your oil heating unit is com-
plete. If an accessory part is missing, please contact the Trotec
customer service or the specialist dealer from whom you pur-
chased the device.
•
Check the oil heating unit and its connection parts for possible
damages.
•
Mount the support, the handle, the wheels and the outlet cone
to the oil heating unit. Please refer to the supplied assembly in-
struction manual for further information. Please use the supplied
assembly tools.
•
Make sure to comply with the requirements described in the
chapter "Installation conditions".
•
Correctly connect the exhaust system of the device to a chimney
or an external wall as shown in the chapter "Exhaust system".
•
Fill the heating oil into the tank with the device switched off and
cooled down.
•
Inspect the device prior to commissioning and check it regularly
for its proper condition during operation.
•
Make sure that the characteristics of the mains supply corre-
spond to those indicated on the rating plate.
•
Each time before switching on the device, make sure that the fan
can move freely before plugging the power plug into the mains
socket.
•
Connect the power supply cable to a properly secured mains
socket (230 V / 50 Hz / 10 A). On construction sites, a residual
current circuit breaker must be connected upstream of the mains
socket according to VDE 0100/0105.
The oil heating unit is now ready for operation. Use the device according
to the functions described in chapter 12 "Functions and operation".
11. Exhaust system
•
Before planning the installation of the exhaust system, the local
chimney sweep must be informed according to DIN 18160.
Risk of injury due to intoxication!
Improper installation of the exhaust system may cause
health problems.
Have the installation carried out by a specialised crafts-
man!
•
Make sure that an unobstructed and sufficient supply of combus-
tion air (e. g. by means of ventilation openings in doors, ceilings,
windows, walls or an ambient air network) is provided.
•
Have the exhaust gas values of the burner checked regularly.
B-4
Chimney duct
Wall duct
A min. 1 m
B min. 1 m
C as short as possible
D ≥ ø 150 mm
E min. 1 m
12. Functions and operation
The device may only be used by persons who have been trained in op-
erating the device.
Switching on the oil heating unit
The oil heating unit features two operating modes:
1. Manual mode
The generator can operate in manual mode.
Operating manual – IDS 45 / 80
1 Chimney connection
2 Wall duct with pipe elbow min. 5°
3 Chimney - minimum internal dimensions 20x20 cm
4 Opening for cleaning with explosion
protection cap
5 External wall
6 Draft reinforcement, H-shaped
EN