Télécharger Imprimer la page

BWT PERLA PRO XXL Notice Originale page 32

Publicité

INSTALLATION
Vacuum breaker vertical mounting
Counter
fitting
1/2'' male + valve
Ø
Softened water
Power supply 230 volts 50/60 Hz
(consumption max.32VA)
Hoses inlet/outlet for softener
Drain of the softener regeneration water.
Sizing of the piping according to the flows mentioned in the
paragraph «evacuation of regeneration water».
Slope 2%
floor drain for overflow
DRAIN
of the salt tank
NOTA:
The location of the counter (option) used for the softener and the dosing unit must be placed at
the outlet of the softener. The vacuum breaker must be mounted vertically and on the softener inlet.
INSTALLATION DIAGRAMS
Diagram volume-based simplex
Diagram volume-based parallel regeneration
regeneration softener
multiplex softeners
Technical manual BWT PERLA PRO XXL - code P0011058 - Rev 10 - 23/11/2021
32

Publicité

loading