Télécharger Imprimer la page

Daikin FTQ18PBVJU Manuel D'installation page 8

Publicité

Les langues disponibles

Les langues disponibles

Refer to Table 2 for the processing dimensions of the
fl are.
Use the fl are nut provided with the unit.
Apply ether oil or ester oil only to inner side of the
fl are and screw in the fl are nut three to four turns fi rst
by hand at the time of connecting the fl are nut.
(Refer to Fig. 4)
Apply ester oil or ether oil
only to inner side of flare.
Refer to Table 2 for the corresponding tightening torque.
Table 2
Flare
Pipe
Tightening torque
dimensions
size
A (in.)
φ 3/8
26.7 ±2.6 lbf·ft
0.504 – 0.520
φ 5/8 50.6 ±5.0 lbf·ft
0.760 – 0.776
CAUTION
Do not excessively tighten the fl are nut.
Doing so will break the fl are nut and refrigerant leakage may
result.
Make sure that all parts around the fl are are free of oil.
The drain pan and the resin part may be deteriorated if oil is
attached.
If no torque wrenches are available, refer to Table 3 as a
standard.
When the fl are nut is tightened with the spanner, the
tightening torque should increase suddenly. Tighten the
fl are nut further for the corresponding angle shown in
Table 3.
Table 3
Pipe size
Further tightening angle
φ 3/8
60 to 90 degrees
φ 5/8
30 to 60 degrees
(2)
On completion of installation work,
gas leakage.
7
Fig. 4
Flare shape
R0.016-0.031
Recommended arm length of
tool
Approx. 7-7/8 in.
Approx. 11-13/16 in.
check that there is no
(3)
Refer to the illustration on the right-hand side and be sure
to perform heat insulation work on the piping joints after
gas leakage checks. (Refer to Fig. 5)
Heat insulation procedure for gas piping
Insulation for fitting (7) (accessory)
Insulation material
Flare nut joint
for piping
(on unit side)
Make sure that
the seam faces
Attached to
upward.
the surface.
Clamp
material (1)
(accessory)
Insulation material
for piping (field supply)
Gas pipe
Heat insulation procedure for liquid piping
Insulation for fitting (6) (accessory)
Insulation material
Flare nut joint
for piping
(on unit side)
Make sure that
the seam faces
Attached to
upward.
the surface.
Main unit
Clamp
material (1)
(accessory)
Insulation material
for piping (field supply)
Use the Insulation for fi tting (6) and (7) provided to the
liquid piping and gas piping, respectively, and conduct
heat insulation work.
(Tighten both edges of the Insulation for fi tting (6) and
(7) for each joint with the Clamp material (1).)
Make sure that the joint of the Insulation for fi tting (6)
and (7) for the joint on the liquid piping and gas piping
side faces upward.
Wrap the Sealing pad (small) (8) around the Insulation
for fi tting (6) and (7) for the joint (fl are nut part).
CAUTION
Be sure to insulate any fi eld piping all the way to the piping
connection inside the unit. Any exposed piping may cause
condensation or burns if touched.
Sealing pad (small) (8)
(accessory)
Wrap the Sealing pad (small) (8)
around the portion from the
surface of the main unit to the
upper part of the flare nut joint.
Liquid pipe
Fig. 5
Sealing pad (small) (8)
(accessory)
Wrap the Sealing pad (small) (8)
around the portion from the
surface of the main unit to the
upper part of the flare nut joint.
English

Publicité

loading