Remove the front panel (upper).
Top panel
Low-voltage
hole
(2)
Remove the electric component box cover.
Terminal block
(3)
Pass the power supply wiring and the ground wire
through the top panel's high-voltage hole (requires use of
conduit) and pass the remote controller wiring and trans-
mission wiring through the top panel's low-voltage hole.
Pass the included insulation tube through the hole in the
panel before connecting the electric wires and the
ground wire to the terminal block shown in Fig. 8.
Pass the included insulation tube through the hole in the
panel before connecting the remote controller wiring
and transmission wires to the terminal block shown in
Fig. 8.
Then secure them in place with the included Clamp
material (1) as shown in Fig. 8 to protect them from
external force from outside the unit.
If the power supply voltage is 208V, change the trans-
former wire connection from the 240V terminal to the
208V terminal. (Refer to Fig. 9)
11
High-voltage
hole
Terminal block
Transformer
<FTQ18,24,30,36PBVJU models>
Transformer
<FTQ42PBVJU model>
Changing the transformer wire connection
Connector
(Connect the wire to the 208V terminal.
Be sure to insert the wire securely until
a clicking sound is produced.)
Wire (Red)
Connector
Cap
230V power supply (factory set)
Terminal block
Terminal block
Fig. 8
Cap
(Change the
connection.)
Wire
(Red)
208V power suppy
Fig. 9