Télécharger Imprimer la page

Hitachi AIR CORE 700 PPIM-B18UFA1DQ Manuel D'utilisation, D'installation Et D'entretien page 24

Masquer les pouces Voir aussi pour AIR CORE 700 PPIM-B18UFA1DQ:

Publicité

Les langues disponibles

Les langues disponibles

6. Drain Piping
6. Drain Piping
1. The condensate pipe connection position is shown in figure 6.1.
2. Prepare a PVC pipe (Outer diameter: 1-17/64inch[32mm]).
3. Fix PVC pipe to the condensate pipe with the adhesion agent and clamps provided by the factories, the
downward slope of the condensate pipe is 1/25 - 1/100.
4. Perform the heat preservation work on the condensate pipe after it is connected.
(When choosing drain pump)
Drain raising pipe (PVC pipe, VP25)
(Installation site preparation)
Drain tank
(When no drain pump is selected)
1/25~1/100
downward slope
Incorrect: leaned upward
Indoor unit
Uplifted part
NOTICE
When the relative humidity of inlet or ambient air exceeds 80%, apply an (field-supplied) auxiliary
drain pan beneath the indoor unit as shown in Fig.6.2.
Pipe support
(Installation site
preparation)
90° bend (VP25)
(Installation site
preparation)
Drain pipe (L300)
Indoor unit
Accessory
rubber plug
(Accessory)
Drain tray
9.3(235)
(Optional)
15.0(380)
Electric
Thermal insulation materials
cabinet
(Prepared for
installation and the site)
Drain pipe
Thermal insulation
materials
Incorrect
Figure 6.1 Condensate Pipe
[Unit: in. (mm)]
Drain pipe (PVC pipe, VP25)
2.3(58)
(Installation site preparation)
1/25 - 1/100 downward slope
1.0(25)
Adhesion agent
(for sealing)
Pipe clamp
PVC pipe (Prepared for
installation and the site)
Connecting the drain pipe
1/25~1/100 downward slope
Share the drain pipe
-12-
Correct
The drain pipe shall
be separated from
other pipes.

Publicité

loading