BEWAMAT is a water softener for domestic use, which
makes it possible to distribute softened water from a
town water network. A system of residual total hardness
adjustment, which is incorporated into the equipment,
makes it possible to mix the softened water. Depending
on the model, the BIO option allows, at each
regeneration, an aseptic of the softener by electrolysis
of the brine.
BEWAMAT is a compact softener unit including :
1
Head of the softener and an electronic
control box
2
Electrical supply 230 V, 50/60 Hz
3
Softening column with the ion exchange resin
4
Compact brine tank
5
Siphon
6
15/21 Flexible hose for the overflow
7
Salt gate for topping up
8
13/17 Flexible hose for regeneration water
discharge connection to the siphon
9
6/8 Flexible hose to connect the brine for
regeneration (6/8 hose supplied)
10
1" Stainless steel flexible hose for water input
11
1" Stainless steel flexible hose for water
output
12
Adjustment set of residual hardness
13
Brine valve
FIELD OF UTILISATION
The utilisation of the BEWAMAT softener must in all
circumstances observe the regulations and legislation in
force in the locality, the establishment or the country in
which the equipment has been installed.
CONDITIONS OF INSTALLATION
It is essential to observe local regulations on installation,
general directives, general conditions of hygiene, safety
and technical data of the system.
The electrical supply for the BEWAMAT of 230V and
50/60 Hz and the operating pressure required for the
good
functioning
of
guaranteed in permanence. The system is not equipped
with a water-hammer protection device and/or a lack
of water, and therefore, if necessary, an adequate
device should be introduced.
A protective filter (not supplied) must be installed
upstream of the BEWAMAT.
The connection to the sewer must be made with a
charge loss between the hose for water regeneration
and sewer, to avoid any risk of pollution of the "drinking
water" by the sewage network; we recommend to do it
using the siphon supplied with the device. From the
40mm self-coupling of the siphon, use a PCV pipe up to
the sewer.
If necessary and if the operating pressure is higher than
2.1 bars, the rinse water hose can be placed up to
1.5 metres above the softener. In that case, it is
necessary to lengthen the recommended duration of
regeneration.
The overflow pipe of the brine reservoir must be inclined
and allow outflow by gravity to the drain or possibly to a
lifting system, which must resist brine. The output of the
system will be determined so that the regeneration
water from the BEWAMAT is evacuated correctly.
If the circuit pressure is greater than 6 bars, a pressure
reducer upstream of the installation must be installed in
ind.04 du 26/11/2009
the
equipment
must
GB-
order to obtain an operating pressure of approximately
4 bars.
The place of installation must be protected from frost,
and the installation must be protected from the ingress
of any chemical substances, dyes, detergents, greases
and vapours. The ambient temperature must not
exceed 40°C and that of the water to be treated a
maximum of 30°C. The softener must be accessible for
maintenance and rest on a flat level surface, provided
for supporting the weight of the softener when
operating (table 1.3).
ASSEMBLY
The hydraulic connection of the BEWAMAT must be
effected using the supplied flexible hose. Observe the
direction of the fluid shown by the arrows, connect the
water to be treated to the
and the water output also to a
right. Fittings 4/4"-5/4" are supplied to adapt where
necessary
the
Then, connect the canalisation for the intake of brine.
After having withdrawn the salt gate, grip the grey 6/8
hose in the brine tank and pass it through the interior
hole to the outside of the tank. Connect the end of the
grey 6/8 hose to the valve of the softener and hold it in
place with the finned connector provided for that
purpose.
Connect the 13/17 hose (rep. 8) on the ribbed
regeneration water outlet connector. Connect it with
the vertical ribbed fitting of the siphon. Collars are
provided in the brine tank to allow to maintain each
end of the hose.
Finally, connect the 15/21 hose (rep. 6) on the overflow
connector of the tank. Connect it with the horizontal
ribbed fitting of the siphon. The maintenance of this pipe
is also made with collars.
To supply electric current to the BEWAMAT, connect the
BEWAMAT softener to the installation standard electric
current socket provided for that purpose, which must be
located close to the installation (maximum 1.5 meters).
be
For the BIO softeners, connect the electric fitting 1 to the
cell 2 which is located on the brine suction hose.
hose n° 9
PROGRAMMING.
On being placed under voltage, a regeneration starts.
The ongoing regeneration is displayed with the letter "R"
on the LCD screen. To stop the regeneration, push the
keys 1 and 2.
7
Instruction BEWAMAT
1" connection on the left
1" connection on the
equipment
for
4/4"
1
2
P0010923
pipes.