Télécharger Imprimer la page

Ergomotion Ebreza Manuel Du Propriétaire page 10

Publicité

installation guide
Always use two people when setting up the base.
If installing a Divided King base, please refer to the Divided King Quick Setup Guide.
STEP 1
Place the bed base box in a desired location with the top of the box facing
up.
Remove the binding straps and packing materials, making sure not to
puncture the box with any sharp objects.
STEP 2
Remove the bed base from the box keeping the bottom of the base
facing upwards.
STEP 3
Legs are shipped fully assembled.
Alternative heights can be achieved by
removing leg segments. To install the
legs, screw the leg into the nutsert on the
frame and tighten by hand. Do not over
tighten.
8
For customer support, visit www.ergomotion.com or call: 1-888-550-3746
STEP 4
To sync two bases see detailed installation
instructions on pages 14-15.
Locate the battery backup strap and set it aside. Be sure that it is accessible
after the base is set up, in case of a power outage.
STEP 5
Uncoil input Power Cord (connected to Control
Box's power port) and plug into Power Supply.
STEP 6
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure that
the Power Supply and all attached cords are
directed toward the desired surge protector.

Publicité

loading