5. PANELS MOUNTING
5.7. Mounting panels to the door
Once all brackets and small brackets
have been applied to the panels, you
can begin installing the bottom drawer.
>
Hook the panel to the fixing devices starting
from the top aligning brackets [ 6 ].
>
At this point, alignment between the panel
and adjacent cabinets can be adjusted using the
alignment brackets and small brackets [ 7 ] and
[ 8 ].
6
7
>
Vertical alignment: tighten or loosen the
screw in the brackets to raise or lower the
panel [ 9 ].
9
>
Depth alignment: working from the inside of
the door, after lifting up the magnetic seal on
the handle side and rotating the plastic covers
on the hinge side, adjust the panel position
in the Z-direction by adjusting the shoulder
bolts and setscrews with the 4mm hex key
in conjunction with each other finally locking
each mounting position in place [ 10 & 11 ].
24
Once the front panel has been ad-
justed, check that the gasket has been
repositioned correctly to assure the
door/drawer are closing correctly and
avoid operational errors of the unit..
8
The
product
in
the
appliance
it
has
to
For handle installation, please refer to the
instruction included in handle's package.
5.8. Mounting panels to the drawer
Note
Once all brackets and handles have
been applied to the panels, you can be-
gin installing the bottom drawer..
Operate as follows:
>
Partially tighten the screw to the receiver [ 1 ].
1
www.smeg.com
handle
is
not
included
packaging,
be
bought
separately.
10
11
but