BUFFER TANK INSTALLATION
1. Preparations
The water tank may only be installed in frost-protected rooms with floor drain. Furthermore, the
storage requires a level, solid and resilient underground. Screw-in feet can be used, paying atten-
tion to heat dissipation to the substrate. The buffer tank may be installed only in rooms protected
from frost. Furthermore, the buffer tank requires a flat, hard and resilient surfaces. The insertion
holes and the total weight when filled must be observed.
When installing the storage tank, measures to avert danger must be taken on site, to avoid
consequential damage from escaping water. The installation site must ideally have a floor drain
for drainage. Is in the building stock a retrofit of a floor drain is not possible, the storage tank must
be in a collection/leakage tray with a waste water connection be set up. The dimensioning of the
waste water connection must cover the entire Can derive storage content and / or system content
and subsequent water.
2. Delivery
Please ensure that the transport route is free of obstacles and tripping hazards. The delivery heights
and widths for the transport route for the buffer tank can be found in the technical data. Please
note also the tilting moment of the buffer tank.
3. Distance to Installations and Walls
The recommended minimum distances are as follows:
cm
Illustration:
Distances from walls
Caution! Wall-hung tank deviation
When designing the wall fastening/bracket for a wall-hung buffer tank the total weight when filled
must always be taken into account. This must be reviewed and calculated by a specialist company
in advance. Standing below the buffer tank is prohibited (if necessary install suitable signage). The
wall mount/holder must be regularly tested (min. once per year) by an appropriate specialist com-
pany for secure mounting and documented.
4. Indication
- PLease note that it is not allowed to put any item on top of the tank! Even after succesful instal-
lation and putting it at work it is forbidden to put any item on the tank!
Similar pictures. Subject to technical changes and changes to content, misprints and errors.
cm
Caution!
According to the
Feuerungsanlagen- verordnung/
[Furnace Installation Ordinance]
a minimum distance from a
solid fuel boiler of 1 m must be
maintained due to flying sparks.
Inspection and inspection openings
must be freely accessible.
EN
31

Publicité

loading