Télécharger Imprimer la page

Active AC 621 Manuel D'instructions Et De Mise En Route page 61

Publicité

Les langues disponibles

Les langues disponibles

14. CHECKS
-
Adjust the belt and cable control tension after the first few working hours to compensate
initial loosening.
-
Briefly operate all the machine's components to detect any abnormal noises or
overheating.
-
During the initial running in period avoid heavy-duty usage to encourage proper settling
of the mechanical parts.
-
Never neglect maintenance operations after work and carry out all prescribed checks
regularly.
A) TYRE PRESSURE
Regularly check the tyre pressure. If both two tyres are not inflated to the same pressure the
machine will tend to travel sideways during operation.
- 61 -

Publicité

loading