1.3
installation overview
9
8
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance.
2. Install rough framing (see "rough framing" section).Place the appliance in its final position.
note:
For Universal Heat Management installation steps, refer to the leaflet provided with the Universal Heat
Management kit. Start Universal Heat Management installation before placing appliance in its final position.
3. Install appliance venting (see "venting installation" section).
4. Install all electrical wirings (see "electrical information" section).
5. Install gas lines (see "gas installation" section).
6. Test appliance.
7. Complete framing (see "finish framing" section).
8. Complete finishing (see "finishing" section).
6
1
7
5
general information
2
3
4
W415-2944 / B / 05.22.24
EN
7