Service
4.
Pull the steel wire and run the air hoist slowly in the lowering direction.
Make sure the first link of the chain drops into an indentation of the chain wheel.
The hoist must not be driven in the lifting direction at this stage because of jamming risk.
5.
When the first link is set in the chain wheel, run slowly in the lifting direction, while continuing to pull
the steel wire.
6.
Run the chain through the control yoke. Secure the end link with the screw and washer, without twist-
ing the chain.
20
EN
© Atlas Copco Industrial Technique AB - 9836 9861 00
LLA2500-L-ATEX