EIBENSTOCK EBM 250/ 2 RP Notice Originale page 97

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30
After each readjustment always check that the screws are tightly
fixed so that safe operating of the drill rig is possible.
Mounting the turnstile
Mount the turnstile (1) on the
right or left side of the
carriage (2) depending on the
work to be performed.
Check whether the turnstile
(1) is fixed tightly.
Fastening of the Drill Rig
Fastening by means of dowels in concrete
Use
For brickwork, Rawl-Dowels
must be used.
Mark the position of the drill holes for the fastening
on the surface to be drilled.
Drill a hole (Ø 15) 50 mm deep (A), into which the
dowel M12 (B) is to be placed; insert and secure
the dowel with the doweling tool (C).
Screw the quick action clamping screw (D) into
the dowel.
Install the drill rig.
Fix the washer (E) and finally the fastening nut
(F) on the quick action clamping screw (D).
Tighten the fastening nut (F) with a wrench SW
27.
Before and after tightening the nut (F), the 4
adjustable screws have to be adjusted in order
to adapt the rig to the surface.
Do check whether the drill rig is
installed safely and firmly.
1
2
13
Klick

Publicité

Table des Matières
loading

Table des Matières