CAUTION
Hardened PU adhesive has settled inside the ma-
chine.
Risk of damage to the machine – loss of warranty
Clean the system no more than six hours after
using PU adhesive (see section Purging to re-
move PU adhesive from the machine).
Glueing the edge band
Cut the edge band down to size, leaving an al-
lowance of approximately 10 cm.
Switch on the machine [1-8].
Select the temperature setting [1-7].
Display [1-20] lights up red = actual and set-
point temperature are displayed. Machine is not
yet ready for operation.
Display [1-20] lights up green = operating tem-
perature reached. Setpoint temperature is dis-
played.
Machine is now ready for operation.
Adjust the relevant settings (chapter Settings).
Press the start button [1-1] once.
Edge inlet mechanism starts up.
Guide the edge band into the edge inlet within 20
seconds [1-11].
The time remaining is shown on the display [1-
.
20]
The edge band is drawn in automatically up to
the light barrier [3-4] .
Inlet stops.
Position the machine on the workpiece [4-1]
approx. 2 cm away from the contact roller [4-3]
with reference to the start marking [4-2] [4].
The start marking [4-2] and edge of the work-
piece must be flush with one another.
Press the start button [1-1] again.
Inlet starts.
Wait until the edge band with adhesive is visible.
Push the machine down onto the workpiece and
guide lengthways from right to left [5]. Exert
14
pressure on the support base and against the
workpiece. Applying pressure in the feed direc-
tion is not necessary.
The edge feed mechanism moves the machine
forwards automatically.
Once the edge band has passed through the
feed completely, the mechanism stops automat-
ically after a short delay.
4 4
4-1
4-2
0,79 inch
4-3