Å Pass the fuel tank breather hose through the
cable guide.
ı Pass the throttle cable and engine stop switch
lead through the cable guide.
Ç Pass the air vent hose through the hose guide.
Î Fasten the CDI unit lead and rectifier/regulator
lead with the plastic clamp.
‰ Align the tape on the rectifier/regulator lead with
the plastic clamp.
Ï After fastening the engine stop switch lead, cut
off any excess from the plastic locking tie end.
Å
1
L
J
5
D
B
D - D
CABLE ROUTING DIAGRAM
3
2
ı
Ç
Ï
I
H
G
K
7
8
H
Ì
B
A
Ì Pass the CDI unit lead through the lead guide.
4
5
Ç
6
B B
B B
7 8
9 0 A
A
A
C
C
C
C
6
B - B
E
2 - 18
SPEC
Î
B
C
D
E
‰
E
F
F
D
B
F
F
D
B
F
6
C - C
D
F - F