Installation Guide
Always use two people when setting up the base.
STEP 1
Place the bed base box in a desired location with the top of the box
facing up. Remove the binding straps and packing materials, making sure
not to puncture the box with any sharp objects.
STEP 2
Remove the bed base from the box, keeping the bottom of the bed facing
upwards.
STEP 3
Locate the Battery Backup Strap and set it aside.
Be sure that it is accessible after the base is set up
in case of a power outage.
STEP 4
When synchronizing control is required, the left and right SmartSync®
Cord must be connected to the transfer lines on the bed plate.
8
STEP 5
Uncoil input Power Cord (connected to Control
Box's power port) and plug into Power Supply.
STEP 6
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure that
the Power Supply and all attached cords are
directed toward the desired surge protector.
Note: Power Supply should be placed out of the
storage bed.