Installation Procedure - Toto Lloyd TB930DD Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Drill hole for shank and retainer pin (see
rough-in spec for detail). remove the spout
from the shank by loosening the set screw
behind the spout. remove nut and washer
from shank. place the shank through the hole
from the top. replace the washer and nut in
reverse order. Tighten the nut with wrench.
screw in the Y-adapter.
note: Do not overtighten the Y-adapter.
2. Disassemble the handle and canopy by
loosening the set screws located under the
handle and behind the canopy. remove the
top nut.
3. insert the valve body through the hole from the
bottom.
4. Use the template to make sure the valve
height from the top of the mounting surface is
correct. adjust the top nut accordingly to set
the correct height.

InsTaLLaTIon PRoCeDuRe

Y-adapter
Canopy
Valve Body
4
shank
Washer
nut
handle
set screw
Top nut
Top nut
Template

Publicité

Table des Matières
loading

Table des Matières