Installation Procedure - Toto TBN02201U Manuel D'installation Et D'utilisation

Plomberie brute de robinetterie de baignoire romaine à trois/quatre trous
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hole Preparation
For 3 Hole Roman Tub Filler / TBN02201 and TBN02202
Required Hole
Deck Thickness
ø1-1/4"~1-7-16"
Max 1-3/4" (45)
(ø 33~37)
Hole Preparation
For 4 Hole Roman Tub Filler / TBN02203 and TBN02204
Required Hole
Deck Thickness
ø1-1/4"~1-7-16"
Max 1-3/4" (45)
(ø 33~37)
Valves
1.Remove Collars from Valves (Hot and Cold) and Diverter Assembly.
Connect Valves and Diverter assembly using connecting tubes (SOLD
SEPARATELY, see detail in Table 1) with provided Gasket (Blue) as shown.
Tighen nuts on connecting tubes until slightly loose (need adjustability for
later installation)
Gasket (BLUE)
Connecting Tube
Hand Shower Port
TBN02203 and
TBN02204 Only

INSTALLATION PROCEDURE

Required Hole
ø1-1/4"~1-7-16"
(ø 33~37)
3-3/4"~6-1/8"
3-3/4"~6-1/8"
(95~155)
(95~155)
Required Hole
ø1-1/4"~1-7-16"
(ø 33~37)
3-3/4"~6-1/8"
3-3/4"~6-1/8"
(95~155)
(95~155)
Unit: inch(mm)
Collar
Gasket (Foam)
Gasket (Rubber)
Washer (Metal)
Mounting Nut
O-rings
C-Clip
Nut
Required Hole
ø1-1/4"~1-7-16"
(ø 33~37)
Required Hole
ø1-1/4"~1-7-16"
(ø 33~37)
Collar
Gasket (Foam)
Plug Cover
Gasket (Rubber)
Washer (Metal)
Mounting Nut
Gasket (BLUE)
4
Required Hole
ø1-1/4"~1-7-16"
(ø 33~37)
Hand shower
mount hole
Collar
Gasket (Foam)
Gasket (Rubber)
Washer (Metal)
Mounting Nut

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Tbn02202uTbn02203uTbn02204u

Table des Matières