INSTALLATION PROCEDURE - Faucet
1.
Ensure O-ring is seated in groove
under spout.
Pass the supply hoses and
mounting stud through the
mounting hole until the spout
comes to rest.
2.
Orient the spout as needed.
From below the mounting
surface, place the crescent
shaped gasket and washer
over the mounting stud as
shown.
Fasten the mounting nut to
the stud to secure the spout.
Tighten with wrench as
needed.
Connect the hoses to the
supply lines.
The left hose (marked with
red band) connects to the
hot water supply.
The right hose connects to
the cold water supply.
Tighten with wrench as
needed.
3.
Insert the drain lift rod through the
opening in the back of spout.
Gasket
Washer
Mounting Nut
4
Spout
O-ring
Mounting
Stud
Supply
Hoses
Drain Lift
Rod