4
5
6
The parts are required to meet the latest RoHS directive.
PLASTIC TIE
PLASTIC TUBE
9
10
11
Model
12/18/24A112AA
4
30/36A112AA
5
6
Reinstall the coil assembly along with bracket(s) that secure(s) it. Failure to reinstall the brackets will result in capacity loss
and condensation formation inside the cabinet. Reconnect the waterproof connector inside the coil section. Refer to 9.3.
Step 1 to 4 in reverse order to reassemble the panels. Ensure the proper knockouts are removed for drainage and
electrical connections.
NOTE
For Horizontal installation an auxiliary drain pan must be installed.
Specifications are subject to change without notice.
7
8
9
NTXAMT12, 18, 24, 30, 36A112AA
③
CORRECT
INCORRECT
5/8"
(15mm)
MITSUBISHI ELECTRIC CORPORATION
DATE
DIM.mm
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
12
13
Tube Length
4.9 in. (125 mm)
7
6.9 in. (175 mm)
8
9
DETAIL A
10
11
12
13
D
E
①
②
F
G
H
ITEM
MODEL NAME
PLASTIC TIE
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
PLASTIC TUBE
SHEARING
A
B
MACHINING
MEDIUMCOARSE
3D
CONFIDENTIAL
APPROVED
J
2
14
15
16
DIM.mm
DATE
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
10
11
12
13
19
14
15
16
① DETAIL A
② Secure with plastic ties 2 per side
③ 2 Plastic tubes ensure tubes drain
into pan
DETAIL B
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
A
B
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
MITSUBISHI ELECTRIC CORPORATION
3D
CONFIDENTIAL
APPROVED
18
14
15
16
© 2018 Mitsubishi Electric Trane HVAC US LLC. All rights reserved.
A
B
C
D
E
F
G
H
I
C
J