4.5
Laying the cables and positioning
4.5.1 Laying the cables
Fig. 24: Laying the cables
End of installing. To remove, proceed in reversed order.
4.5.2 P ositioning
Phillips screwdriver
2nd person
Fig. 25: Positioning 1
Fig. 26: Positioning 2
1.
2.
1.
2.
3.
S elect sufficiently long cables for
e nsuring mobility of the flat screens.
Clip the cables in the cable manage-
ment system like shown.
Loosen the Phillips screws on the
b ackside a little bit, to move the flat
screens horizontally.
Tighten the Phillips screws again.
A lign the flat screen as needed
>> vertically
>> horizontally and/or
>> in rotation axis
25