Plumbing
Ensure that the AquaRite installation does not constitute a cross connection with the local potable
water supply. Consult local plumbing codes.
The AquaRite is packaged with a Turbo cell, flow switch and cell unions. Refer to page 2 for informa-
tion about available AquaRite models.
The flow switch and cell should be plumbed in the return line to the pool/spa. The preferred instal-
lation is after (downstream) all the pool equipment (filter, heater, solar, etc.). The electrolytic cell and
flow switch tee fitting are designed to be plumbed into 2" (51mm) PVC pipe. Adapters (not included)
can be used for systems with 1½" (38 mm) plumbing.
For proper plumbing, refer to the overview diagram on page 11 and the diagram below.
Flow Switch:
Electrolytic Cell:
Wiring
Power must be shut off at the circuit breaker before performing any wiring. Be sure to follow Local and
NEC electrical codes. To provide safe operation, the AquaRite must be properly grounded and bonded.
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
Flow
Switch
12"
min
IMPORTANT: There must be at least a 12" (25cm) straight pipe run before
(upstream) the flow switch. If the switch is plumbed after the cell, the cell can
by counted as the 12" (25cm) of straight pipe. To ensure proper operation,
verify that the arrow on the flow switch (located on top of gray hex) points in
the direction of water flow.
Install using the unions provided. Tighten unions BY HAND for a watertight
seal. For pool/spa combination systems with spillover, use configurations #2
or #3 above to allow chlorination of both the pool and spa during spillover but
preventing overchlorination when operating the spa only.
Electrolytic
Cell
POOL
POOL
3 Way
Valve
SPA
SPA
12