Télécharger Imprimer la page

Kessel Aqualift Comfort 400V Mono Instructions De Pose Et D'utilisation page 63

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 79
5
Initial commissioning
5.1
Switch on and off
Connect the battery
Connect the battery connector(s) (2).
5.1.1
Connect to the mains voltage
Establish mains voltage (400V control units)
Connect the mains cable to the mains power supply.
Move main switch (1) into ON position.
✓ Initialisation starts automatically.
52 / 204
All manuals and user guides at all-guides.com
Installation and operating manual
The device checks the electrical components.
Voltage test of the standby batteries.
Menu item
|3.10. Language|
Switch on
Turn main switch (1) into ON position. After a successful sys-
tem test, the display shows
green LED signals readiness.
If the display does not show initialisation
guage|) the control unit has already been initialised. In this
case, the set parameters must be checked, or reset to the
factory settings
(|3.11
Reset|). After resetting to the fac-
tory settings, the initialisation of the control unit starts auto-
matically.
Please note that the counter for the maintenance interval is
not changed by the resetting to the factory settings.
5.2
Carrying out initialisation
During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|
|System variant|
|Power rating|
is displayed.
and the
|0 System info|
(|3.10. Lan-
010-532_06

Publicité

loading

Ce manuel est également adapté pour:

Aqualift comfort 400v duo