Télécharger Imprimer la page

Seca 655 Mode D'emploi page 95

Publicité

Les langues disponibles

Les langues disponibles

5.5 Establishing the power supply
5.6 Installing the drip guard
NOTICE!
Incorrect measurement as a result of force shunt
The barcode scanner and scanner holder lie in the weighing-sensitive
area of the device. If the barcode scanner is not placed back in the
scanner holder after scanning, the measuring result is falsified.
► Place the scanner back in the scanner holder after each scanning
procedure.
4. Establish the power supply ➔
The device is supplied with power by a plug-in power supply unit.
NOTICE!
Damage to device as a result of excessive voltage
Commercially available power supply units may deliver a higher
voltage than that stated on them. The device may overheat, catch fire,
melt or short-circuit.
► Use only the original seca plug-in power supply unit with controlled
12 V output voltage ➔
page
137.
1. Plug the adapter required for your power supply into the power supply
unit.
2. Insert the device connector of the power supply unit into the power
supply connection socket of the device.
3. Plug the power supply unit into a power supply socket.
4. Perform a function check ➔
NOTICE!
Damage to device due to the ingress of fluids
Damage may occur to the device if dripping water or other fluids enter
the device via the connection panel.
► Only operate the device with the drip guard installed.
1. Connect all cables as described in these instructions for use and in the
installation instructions for the compatible products.
Establishing the power supply, page
Optional accessories and spare parts,
Function check, page
124.
Starting up the device • 95
English
95.

Publicité

loading

Ce manuel est également adapté pour:

654