APPLICATION INFORMATION
EN
A P P L I C AT I O N I N F O R M AT I O N
1. Before ap p ly in g t he C r y o/ Cu f f,
p re pare the co o l er (F ig u re 1 )
•
Connect the blue tube to cooler.
•
Add cold water to line inside cooler.
•
Fill with ice.
•
Lay insulation disk on top of ice. Attach cooler lid snugly.
•
Allow five minutes with occasional shaking to chill water.
2. Alwa ys a pply E MPT Y C r y o /Cu ff
( Fi gure 2 )
•
Use only Aircast Cryo/Cuffs and ArcticFlow Cuffs with Aircast
Cryo/Cuff IC Unit. Cuff is the Applied Part.
•
Carefully and completely read instructions supplied with
the specific Cryo/Cuff prior to application. Please follow the
instructions below to continue cooler preparation.
3. Fill a n d pres s u r ize C ry o/ Cu f f
( Fi gure 3 )
•
To fill cuff: Connect blue tube to the Cuff. Raise cooler no more
than 15" (38cm) above the cuff for approximately 30 seconds
while Cryo/Cuff fills.
•
To correctly position cooler: Place cooler on stable surface.
The cooler base should be even with the Cuff.
NOTE: To AVOID excessive pressure during use, DO NOT raise
the cooler higher than 15" (38 cm) above the Cryo/Cuff.
•
To turn cooler on: Plug power supply into wall outlet and
connect cord to lid.
•
To turn off the equipment disconnect the power supply.
•
To refill cooler: When Ice has melted , unplug the cooler and
repeat items 1-5 under Step 1.
•
For specific cuffs, please refer to instructions for installation of
each cuff and follow procedure above.
4
Figure 1
Figure 2
Figure 3